At height · Melbourne · Since 1979
Reliability Redefined.
From first roof walk to final report, TWC delivers commercial rope access, BMU, EWP, glazing and facade services for Melbourne’s most demanding buildings.
Partners at height.
Explore services
Years of operation
2026 → 1979
Since 1979 · 47 years of operation
Proof
Melbourne’s buildings at height, since 1979
- Rialto TowersSince 1986
- 340+ sitesAcross Victoria
- ISO 9001 · 14001 · 45001Certified
- IRATAMember
- $20MPublic liability
Live now · AI reception
AutoMate
Real experience. Faster answers.
Sophia answers 24/7, takes your details and books a callback with our team.
Sophia · Tower's AI assistantTower, this is Sophia, Tower's AI assistant. How can I help?
Building managerWe've got a cracked pane on level 12.
SophiaThanks, I've taken your details and booked a callback. Our team will call you back.
What we do
Height-access services, every way up.
Window cleaning, rope access, BMU, EWP, glazing, inspection and height safety for Melbourne’s commercial buildings — one standard on every method.
High-rise window cleaningGlass on Melbourne’s commercial towers, by whichever access the elevation needs.
Rope accessIRATA-certified technicians on complex elevations.
BMU operationsPlanned programmes from your building maintenance unit.
EWP accessBoom, scissor and travel-tower access for atria and canopies.
Glazing & glass replacementRepair, replacement and sealing at height.
Facade inspection & reportingPhotographic condition reports from the elevation.
Anchor testing & height safetyAnchors, davits and access systems tested and certified.
Facade cleaning & pressure washingFacades, concrete, tiles and precincts brought back.
How we work
How we work: four steps, one partner.
The same order on every job, from the first roof walk to a report the same day.
See how we work- 01
Assess
We read the building, its access, constraints and presentation standard.
- 02
Plan
Scope by elevation, a site-specific safe work method statement, anchors and rescue.
- 03
Execute
The right access method, qualified technicians, and work that stops when the wind picks up.
- 04
Report
Photos, faults and finish reported plainly, the same day.
Case study · Rialto Towers
Rialto Towers: 40 years on Collins Street.
Tower has looked after Rialto since 1986. The contract lasts because faults, weather and outages are ours to solve, the building knowledge stays, and the reporting stays honest.
Read the Rialto story →G · Ground floor